• Energy Decision # 59 - Interval Data Monetization Explained: What to Grant
    Oct 22 2026

    Interval data monetization and third-party analytics access rights decide who can see your facility's 15-minute meter data, what they may do with it, and what you get in return for it.

    This is Energy Decision #59 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.

    In this episode, Daniel Burke covers:

    - What interval meter data is, and why more than 35,000 readings a year reveal far more than 12 monthly bills

    - What a whole building load profile can reveal about production schedules and capacity

    - Who owns my facility's interval meter data, and how customer energy data consent works

    - Aggregated energy data versus site-specific data

    - Green Button Connect My Data versus utility NDA data sharing

    - Read-only analytics versus VPP aggregator data access that carries control commands

    - The data deletion clause and the five-year data retention precedent from a Minnesota PUC data access order

    - Value-sharing, and what ComEd's Rider Interval Meter Usage Data shows about smart meter data monetization

    - Writing one data access agreement for facilities in states with different rules

    Who this is for: Facilities managers, operations directors, plant managers and CFOs at manufacturing plants, cold storage and food processing facilities, healthcare systems, data centers, multi-site retail chains and university campuses who are being asked to hand over interval meter data, sometimes as a condition of service.

    If you're trying to decide whether to grant third-party data access to your interval meter data, and under what contract terms that protect your competitive information while capturing some of its value, this episode is built for you.

    Read the full breakdown on Interval Data Monetization and Third-Party Analytics Access Rights for C&I Meter Data at www.tac-nrg.com

    If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.

    Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.


    00:00 Don't Sign an Analytics Agreement Yet

    00:30 Interval Data and Third-Party Access

    01:22 Refuse, Narrow, or Trade for Value

    02:18 What Your Load Profile Reveals

    04:15 Who Owns Interval Data

    06:40 Three Pathways for Third-Party Access

    08:06 Structural vs. Contractual Protection

    09:03 Live Meter Data and Demand Response

    10:30 Separate Dispatch and Curtailment Rights

    10:58 Retention Limits and Deletion Clauses

    11:52 Why Interval Data Has Market Value

    13:41 The Right Order to Negotiate Access

    14:40 When Sharing Helps or Is Required

    16:05 Red Flags and Questions to Ask

    19:45 Energy Decision Blueprint

    Mehr anzeigen Weniger anzeigen
    22 Min.
  • Energy Decision # 58 - Advanced Metering Infrastructure (AMI) Explained: Use the Data You Already
    Oct 21 2026

    Advanced Metering Infrastructure (AMI) and Submetering determine how much of your facility's power use you can see, which parts of the building you can see it for, and who else can see it.

    This is Energy Decision #58 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.

    In this episode, Daniel Burke covers:

    - The FERC definition of AMI, which covers hourly or more frequent recording and daily transmittal

    - AMR vs AMI, and why one-way meter reading assumptions leave interval data unused

    - How to get 15-minute interval data and daily peak demand from your utility portal

    - How interval data supports demand charge management, load shifting and time-of-use rates

    - Why utility AMI measures only at the main meter, and when submetering is needed for tenant cost allocation

    - Submeter billing accuracy, tenant billing disputes and revenue leakage

    - Utility data access and load shape confidentiality

    - The AMI 2.0 meter replacement cycle and how to time your submetering investment

    - Technology-neutral procurement and cost/benefit analysis before vendor selection

    Who this is for: Facilities managers, plant managers, operations directors and CFOs at industrial facilities, manufacturing plants, commercial real estate, multi-tenant buildings, K-12 districts and municipalities who pay for power they cannot see inside their own buildings.

    You may be asking whether your utility smart meter replaces submetering, or how to get 15 minute interval data from your utility, or how to put AMI and submetering to work to cut costs. If so, this episode is built for you.

    Read the full breakdown on Advanced Metering Infrastructure (AMI) and Submetering at www.tac-nrg.com

    If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.

    Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.


    00:00 Your Utility May Already Have Your Data

    00:59 AMI vs. Submetering

    01:58 Energy vs. Demand Charges

    02:55 One Bad 15-Minute Interval

    03:24 How AMI Works vs. AMR

    05:18 Demand Management, Load Shifting and TOU

    06:15 What Submeters Reveal

    07:41 Can the Main Meter Answer Your Question?

    09:32 Submetering Payback and Tenant Billing

    10:30 Data Access and Privacy

    11:56 The Right Order Before Spending Capital

    12:54 Don't Let Vendors Define the Scope

    14:45 What to Pull From Your Utility Portal

    16:12 Final Checklist for Your Team

    17:11 Energy Decision Blueprint and Review Process

    Mehr anzeigen Weniger anzeigen
    20 Min.
  • Energy Decision # 57 - Rooftop Solar Structural Explained: Re-Roof or Walk Away
    Oct 20 2026

    The rooftop solar structural and roof-warranty decision for aging industrial and school roofs often decides whether a solar project pays off, long before the payback math gets a vote.

    This is Energy Decision #57 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.

    In this episode, Daniel Burke covers:

    - The lifespan mismatch between 25-30 year solar panels and 15-20 year commercial roof membranes

    - Remaining useful life versus roof age, and the 10-15 year re-roof threshold

    - Solar panel removal and reinstallation cost, and the math on re-roofing first

    - Roof load capacity for solar in pounds per square foot, and the stamped structural engineer letter

    - Ballasted versus mechanically attached solar racking, drainage, and ponding water

    - How a roof warranty gets voided, including third-party alteration clauses and overburden protection forms

    - The solar PPA roof replacement clause, including lost production payments, removal cost caps, and timeline penalties

    - Solar carport and ground-mount alternatives when the roof can't carry panels

    - Specifying an 80-mil membrane when re-roofing for solar

    Who this is for: facilities managers, operations directors, and CFOs at K-12 school districts, municipal facilities, warehouses, and small-to-mid manufacturers with aging flat or low-slope roofs who are weighing a rooftop solar proposal.

    If you're asking whether you should replace your roof before installing solar, or whether rooftop solar will void your commercial roof warranty, this episode is built for you.

    Read the full breakdown on the Rooftop Solar Structural and Roof-Warranty Decision for Aging Industrial and School Roofs at tac-nrg.com

    If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.

    Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.


    00:00 Why Solar and Aging Roofs Create a Mismatch

    01:24 Three Questions That Decide Fit

    01:54 Panel Life vs. Roof Membrane Life

    04:46 Hidden Removal and Reinstallation Costs

    06:40 Spare Structural Capacity

    08:33 Why a Stamped Structural Letter Matters

    10:24 Ballasted vs. Mechanically Attached Systems

    12:48 When Carports or Ground Mounts Make More Sense

    13:13 Solar and Roof Warranty Disputes

    16:55 The Roof Replacement Clause in a PPA

    18:50 The Correct Evaluation Order

    20:13 Red Flags in Weak Solar Proposals

    21:39 Notify Your Insurance Carrier Before Signing

    23:08 Bottom Line: Roof Health Before Solar Math

    25:00 Energy Decision Blueprint and Facility Support

    Mehr anzeigen Weniger anzeigen
    27 Min.
  • Energy Decision # 56 - Industrial Power Quality Solutions Explained: Diagnose First
    Oct 19 2026

    Industrial power quality solutions protect electronic equipment from voltage sags, transients, harmonic distortion, voltage imbalance and interruptions. Buying them in the wrong order can waste capital on protection that never addresses the actual problem.

    This is Energy Decision #56 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.

    In this episode, Daniel Burke covers:

    - Warning signs of poor power quality, such as unexplained tripped breakers, PLC resets and equipment running hot

    - Why most power quality disturbances originate behind the meter rather than on the utility grid

    - Voltage sags and swells, voltage transients, harmonic distortion, voltage imbalance and interruptions

    - How a power quality survey measures each disturbance, and why it must run for days or weeks under normal operation

    - IEEE 519-2022 harmonic distortion limits and ANSI C84.1-2020 voltage variation limits

    - Grounding-first sequencing before any mitigation equipment purchase

    - Surge protection device zones of protection, harmonic filters, voltage regulators and UPS systems

    - Vendor red flags and the questions that expose a weak power quality proposal

    Who this is for: Facilities managers, plant managers and operations directors at industrial manufacturing plants, healthcare facilities, water and wastewater treatment plants and commercial buildings who are dealing with unexplained equipment failures and downtime.

    If you're trying to decide whether to invest in power quality conditioning and harmonic filtering, or wondering how to tell if a power problem comes from the utility or from inside your building, this episode is built for you.

    Read the full breakdown on Industrial Power Quality Solutions at tac-nrg.com

    If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.

    Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.

    00:00 Introduction to Industrial Power Quality
    02:26 Understanding Power Quality and Voltage
    05:17 Conducting a Power Quality Survey
    07:32 Zones of Surge Protection
    10:21 IEEE 519 and Harmonic Limits
    12:36 Voltage Sags and Swells
    14:58 Solutions for Voltage Sags and Swells
    15:26 Voltage Imbalance and Its Impact
    15:55 Addressing Voltage Imbalance
    16:25 Interruptions and Backup Power
    16:52 Using UPS for Power Continuity
    17:17 Order of Fixing Power Quality Issues
    18:13 Steps to Diagnose and Fix Power Problems
    19:10 Targeted Protection for Specific Machines
    19:38 When Power Solutions Can Hurt
    20:06 Evaluating Power Quality Vendors
    20:35 Questions to Ask Vendors
    21:28 Action Steps for Power Quality Improvement
    21:54 Case Study: Utility and Building Fixes
    22:25 Final Recommendations and Resources

    Mehr anzeigen Weniger anzeigen
    26 Min.
  • Energy Decision # 55 - On-site Solar PV Explained: When It Pays
    Oct 9 2026

    On-site solar PV for C&I customers can lower operating costs and stabilize part of your power price. That only holds when your electricity rate, your state's export rules, your daytime load, and your ownership structure line up.
    This is Energy Decision #55 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.
    In this episode, Daniel Burke covers:
    - Behind-the-meter solar: self-consumption vs. exported energy, and how exports are credited depending on your state
    - Energy billed per kilowatt-hour vs. demand billed per kilowatt, and which one solar offsets
    - Solar plus storage for peak shaving, demand charge management, and backup power
    - Why your marginal energy charge sets your commercial solar payback period, and why your average bill rate overstates it
    - The split incentive problem between building owners and tenants
    - Export rule changes: California's net billing tariff and Indiana's phase-out of net metering
    - Direct ownership vs. third-party ownership: cash, loans, solar leases, and the solar PPA
    - The federal tax credit and its current deadlines, depreciation, SRECs, and elective pay for schools and municipalities
    Who this is for: plant managers, facility managers, and finance leaders at manufacturing plants, school districts, municipalities, breweries, farms, and retail operations who have a solar proposal in front of them and need to know whether the payback holds up.
    If you're asking whether solar makes sense for your manufacturing plant, or how a solar PPA compares with a cash purchase, this episode is built for you.
    Read the full breakdown on On-site Solar PV for C&I Customers at www.tac-nrg.com
    If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.
    Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.

    Mehr anzeigen Weniger anzeigen
    10 Min.
  • Energy Decision # 54 - ISO 50001 Explained: Savings That Last
    Oct 8 2026

    ISO 50001 and Strategic Energy Management (Expedited) give industrial and commercial facilities a structured energy management system for cutting energy costs year after year.

    This is Energy Decision #54 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.

    In this episode, Daniel Burke covers:

    - ISO 50001 energy management system (EnMS) requirements and the Plan-Do-Check-Act cycle

    - Energy review, energy baseline, and production-normalized energy performance indicators (EnPIs)

    - EU 2026-2027 thresholds and Germany's EnMS requirement

    - How much ISO 50001 saves, per ISO and DOE Superior Energy Performance data

    - Non-production period consumption on weekends and shutdowns

    - Sub-metering and the ISO 50001 payback period on monitoring infrastructure

    - Organizational failure modes and ISO 9001/14001 High-Level Structure integration

    Who this is for: plant managers, facility managers, and operations and finance executives at manufacturing plants, industrial facilities, commercial buildings, and municipalities who need energy cost reductions that last.

    If you're asking "do I need ISO 50001 for my facility" or how to build an energy management system for sustained savings, this episode is built for you.

    Read the full breakdown on ISO 50001 and Strategic Energy Management (Expedited) at tac-nrg.com

    If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.

    Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.

    Mehr anzeigen Weniger anzeigen
    10 Min.
  • Energy Decision # 53 - Voltage Sags Explained: Find the Root Cause
    Oct 7 2026

    Voltage sags and swells are short voltage disturbances. They reset controls, cost your motors torque, and drive out-of-warranty equipment repairs in commercial and industrial facilities.

    This is Energy Decision #53 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.

    In this episode, Daniel Burke covers:

    - The thresholds: a voltage sag (dip) is 10 to 90 percent of nominal, a voltage swell is 110 percent or more, and how both differ from a transient voltage

    - Undervoltage and overvoltage as the sustained versions of sags and swells

    - Operational symptoms, including equipment resets, lighting flicker, and motor torque loss

    - Common causes, from motor starts and loose connections to line-to-ground faults and transformer tap settings

    - A four-step troubleshooting sequence using stakeholder interviews, thermal imaging, and multimeter checks

    - How power analyzer data, combined with other checks, helps you tell whether a sag starts inside or outside your facility

    - Mitigation by event type and cost: fixing internal causes, hardening sensitive controls, and saving a UPS for loads where the cost of a trip justifies it

    - Why a periodic power quality study makes sense even when your plant shows no symptoms

    If you've asked "why does my equipment keep resetting" or "how do I tell if a voltage problem is the utility or internal," this episode answers both.

    Who this is for: plant managers, facility managers, and operations executives at manufacturing plants, hospitals, commercial buildings, and industrial facilities who are dealing with unexplained resets, motor faults, and early equipment failures.

    If you're working out how to protect your equipment and operations from the cost of voltage sags and swells, this episode is built for you.

    Read the full breakdown on Voltage Sags and Swells at tac-nrg.com

    If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.

    Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.

    Mehr anzeigen Weniger anzeigen
    9 Min.
  • Energy Decision # 52 - High-Efficiency Commercial HVAC Systems Explained: Buy for Part Load
    Oct 6 2026

    High-Efficiency Commercial HVAC Systems are the largest single energy end use in most commercial buildings. The Whole Building Design Guide estimates HVAC accounts for 39% of the energy used in U.S. commercial buildings, and most systems run at 50% or less of their capacity.

    This is Energy Decision #52 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.

    In this episode, Daniel Burke covers:

    - HVAC part-load performance and why rated peak efficiency only applies at full load

    - Oversized HVAC equipment and ASHRAE 90.1 safety factors as an upper limit

    - Sizing replacements against measured BAS trend data and utility interval data

    - Condensing boiler efficiency, return water temperature, and how it compares with firetube, watertube and cast iron boilers

    - ENERGY STAR commercial boiler thermal efficiency and turndown ratio

    - Chiller full-load kW per ton and IPLV/NPLV part-load ratings

    - CAV with reheat compared with VAV systems

    - DDC controls, variable speed drive chillers, water temperature reset and integrated chiller plant control

    - HVAC commissioning and whole-building integration

    - What payback estimates for whole-building design do and don't tell you about a single equipment replacement

    Who this is for: facility managers, plant managers and operations and finance executives at office buildings, schools, hospitals, manufacturing facilities and municipal buildings who are paying to heat and cool with equipment sized for conditions that rarely occur.

    If you're deciding which high-efficiency HVAC solutions to invest in, or asking whether your chiller is oversized, this episode is built for you.

    Read the full breakdown on High-Efficiency Commercial HVAC Systems at www.tac-nrg.com

    If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.

    Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.

    Mehr anzeigen Weniger anzeigen
    9 Min.