Energy Answers with Daniel Burke Titelbild

Energy Answers with Daniel Burke

Energy Answers with Daniel Burke

Von: Daniel Burke
Jetzt kostenlos hören, ohne Abo

Saisonale Sparangebote | 0,99 € pro Monat für die ersten 3 Monate

Danach 6,99 €/Monat. Bedingungen gelten. Monatlich kündbar.

Energy Answers is the commercial and industrial energy management show by Daniel Burke, presented by Tactical Energy Group. This series covers the complete C&I energy canon — 100 decisions every plant manager, facilities director, and industrial operator needs to understand: demand charges, power factor, utility rate structures, energy procurement, load management, demand response, backup power, renewable options, submetering, and everything in between. If you manage a facility and energy costs or power reliability are on your radar, this is where you get real answers on the first visit. New episode every week.

2026 Daniel Burke
Politik & Regierungen Ökonomie
  • Energy Decision # 59 - Interval Data Monetization Explained: What to Grant
    Oct 22 2026

    Interval data monetization and third-party analytics access rights decide who can see your facility's 15-minute meter data, what they may do with it, and what you get in return for it.

    This is Energy Decision #59 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.

    In this episode, Daniel Burke covers:

    - What interval meter data is, and why more than 35,000 readings a year reveal far more than 12 monthly bills

    - What a whole building load profile can reveal about production schedules and capacity

    - Who owns my facility's interval meter data, and how customer energy data consent works

    - Aggregated energy data versus site-specific data

    - Green Button Connect My Data versus utility NDA data sharing

    - Read-only analytics versus VPP aggregator data access that carries control commands

    - The data deletion clause and the five-year data retention precedent from a Minnesota PUC data access order

    - Value-sharing, and what ComEd's Rider Interval Meter Usage Data shows about smart meter data monetization

    - Writing one data access agreement for facilities in states with different rules

    Who this is for: Facilities managers, operations directors, plant managers and CFOs at manufacturing plants, cold storage and food processing facilities, healthcare systems, data centers, multi-site retail chains and university campuses who are being asked to hand over interval meter data, sometimes as a condition of service.

    If you're trying to decide whether to grant third-party data access to your interval meter data, and under what contract terms that protect your competitive information while capturing some of its value, this episode is built for you.

    Read the full breakdown on Interval Data Monetization and Third-Party Analytics Access Rights for C&I Meter Data at www.tac-nrg.com

    If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.

    Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.


    00:00 Don't Sign an Analytics Agreement Yet

    00:30 Interval Data and Third-Party Access

    01:22 Refuse, Narrow, or Trade for Value

    02:18 What Your Load Profile Reveals

    04:15 Who Owns Interval Data

    06:40 Three Pathways for Third-Party Access

    08:06 Structural vs. Contractual Protection

    09:03 Live Meter Data and Demand Response

    10:30 Separate Dispatch and Curtailment Rights

    10:58 Retention Limits and Deletion Clauses

    11:52 Why Interval Data Has Market Value

    13:41 The Right Order to Negotiate Access

    14:40 When Sharing Helps or Is Required

    16:05 Red Flags and Questions to Ask

    19:45 Energy Decision Blueprint

    Mehr anzeigen Weniger anzeigen
    22 Min.
  • Energy Decision # 58 - Advanced Metering Infrastructure (AMI) Explained: Use the Data You Already
    Oct 21 2026

    Advanced Metering Infrastructure (AMI) and Submetering determine how much of your facility's power use you can see, which parts of the building you can see it for, and who else can see it.

    This is Energy Decision #58 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.

    In this episode, Daniel Burke covers:

    - The FERC definition of AMI, which covers hourly or more frequent recording and daily transmittal

    - AMR vs AMI, and why one-way meter reading assumptions leave interval data unused

    - How to get 15-minute interval data and daily peak demand from your utility portal

    - How interval data supports demand charge management, load shifting and time-of-use rates

    - Why utility AMI measures only at the main meter, and when submetering is needed for tenant cost allocation

    - Submeter billing accuracy, tenant billing disputes and revenue leakage

    - Utility data access and load shape confidentiality

    - The AMI 2.0 meter replacement cycle and how to time your submetering investment

    - Technology-neutral procurement and cost/benefit analysis before vendor selection

    Who this is for: Facilities managers, plant managers, operations directors and CFOs at industrial facilities, manufacturing plants, commercial real estate, multi-tenant buildings, K-12 districts and municipalities who pay for power they cannot see inside their own buildings.

    You may be asking whether your utility smart meter replaces submetering, or how to get 15 minute interval data from your utility, or how to put AMI and submetering to work to cut costs. If so, this episode is built for you.

    Read the full breakdown on Advanced Metering Infrastructure (AMI) and Submetering at www.tac-nrg.com

    If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.

    Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.


    00:00 Your Utility May Already Have Your Data

    00:59 AMI vs. Submetering

    01:58 Energy vs. Demand Charges

    02:55 One Bad 15-Minute Interval

    03:24 How AMI Works vs. AMR

    05:18 Demand Management, Load Shifting and TOU

    06:15 What Submeters Reveal

    07:41 Can the Main Meter Answer Your Question?

    09:32 Submetering Payback and Tenant Billing

    10:30 Data Access and Privacy

    11:56 The Right Order Before Spending Capital

    12:54 Don't Let Vendors Define the Scope

    14:45 What to Pull From Your Utility Portal

    16:12 Final Checklist for Your Team

    17:11 Energy Decision Blueprint and Review Process

    Mehr anzeigen Weniger anzeigen
    20 Min.
  • Energy Decision # 57 - Rooftop Solar Structural Explained: Re-Roof or Walk Away
    Oct 20 2026

    The rooftop solar structural and roof-warranty decision for aging industrial and school roofs often decides whether a solar project pays off, long before the payback math gets a vote.

    This is Energy Decision #57 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.

    In this episode, Daniel Burke covers:

    - The lifespan mismatch between 25-30 year solar panels and 15-20 year commercial roof membranes

    - Remaining useful life versus roof age, and the 10-15 year re-roof threshold

    - Solar panel removal and reinstallation cost, and the math on re-roofing first

    - Roof load capacity for solar in pounds per square foot, and the stamped structural engineer letter

    - Ballasted versus mechanically attached solar racking, drainage, and ponding water

    - How a roof warranty gets voided, including third-party alteration clauses and overburden protection forms

    - The solar PPA roof replacement clause, including lost production payments, removal cost caps, and timeline penalties

    - Solar carport and ground-mount alternatives when the roof can't carry panels

    - Specifying an 80-mil membrane when re-roofing for solar

    Who this is for: facilities managers, operations directors, and CFOs at K-12 school districts, municipal facilities, warehouses, and small-to-mid manufacturers with aging flat or low-slope roofs who are weighing a rooftop solar proposal.

    If you're asking whether you should replace your roof before installing solar, or whether rooftop solar will void your commercial roof warranty, this episode is built for you.

    Read the full breakdown on the Rooftop Solar Structural and Roof-Warranty Decision for Aging Industrial and School Roofs at tac-nrg.com

    If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.

    Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.


    00:00 Why Solar and Aging Roofs Create a Mismatch

    01:24 Three Questions That Decide Fit

    01:54 Panel Life vs. Roof Membrane Life

    04:46 Hidden Removal and Reinstallation Costs

    06:40 Spare Structural Capacity

    08:33 Why a Stamped Structural Letter Matters

    10:24 Ballasted vs. Mechanically Attached Systems

    12:48 When Carports or Ground Mounts Make More Sense

    13:13 Solar and Roof Warranty Disputes

    16:55 The Roof Replacement Clause in a PPA

    18:50 The Correct Evaluation Order

    20:13 Red Flags in Weak Solar Proposals

    21:39 Notify Your Insurance Carrier Before Signing

    23:08 Bottom Line: Roof Health Before Solar Math

    25:00 Energy Decision Blueprint and Facility Support

    Mehr anzeigen Weniger anzeigen
    27 Min.
adbl_web_anon_alc_button_suppression_t1
Noch keine Rezensionen vorhanden