Built Different Titelbild

Built Different

Built Different

Von: Spring Street Management Group
Jetzt kostenlos hören, ohne Abo

Nur 0,99 € pro Monat für die ersten 3 Monate

Danach 9.95 € pro Monat. Bedingungen gelten.

Über diesen Titel

Built Different is a daily podcast for developers, general contractors, and capital partners working in modular, volumetric, and off-site construction. No hype. No futurism. Just execution reality. Each episode breaks down what actually determines success or failure in factory-built projects: coordination gaps, design freeze timing, transportation risks, sequencing failures, financing mismatches, and the hidden costs no one models. This isn't a show about the promise of modular. It's about what happens when modules hit the jobsite—and what you need to get right before they do. Topics include: Why modular projects fail (and it's not the factory) Design freeze and its hidden costs Transportation as construction risk Site work that still controls the timeline Where modular actually saves money—and where it doesn't Sequencing, coordination, and the gaps between systems 3-4 minutes daily. Built for people who build. Brought to you by Spring Street Management Group.© 2026 Spring Street Management Group Management & Leadership Persönliche Finanzen Ökonomie
  • Why Sequencing Determines Success or Failure
    Jan 8 2026
    Modular construction lives or dies on sequencing. Not just factory sequencing—but the coordination between design, production, transportation, and site.

    Get it wrong anywhere, and the whole system fails.

    In this episode:

    • Why modular has no room for re-sequencing on the fly
    • How one out-of-sequence module shuts down the entire operation
    • The fragile coordination between factory, transport, and site
    • Why successful projects have someone who owns sequencing end-to-end

    Built Different is brought to you by Spring Street Management Group.

    Mehr anzeigen Weniger anzeigen
    4 Min.
  • What No One Models in Modular Schedules
    Jan 7 2026
    Modular schedules look impressive on paper—until you account for what's missing.

    Most pro formas ignore the coordination time, logistics buffers, and site work that still controls the critical path.

    In this episode:

    • Why the "50% faster" claim assumes everything goes right
    • The gaps no one models: transport permits, weather holds, button-up time
    • Why site work still controls the timeline
    • How schedules that win deals aren't schedules that deliver buildings

    Built Different is brought to you by Spring Street Management Group.

    Mehr anzeigen Weniger anzeigen
    3 Min.
  • Why Early Design Decisions Matter More in Modular
    Jan 6 2026
    In traditional construction, you can push decisions downstream. In modular, you can't.

    Design freeze happens months earlier, and every delayed decision cascades through production, logistics, and site work.

    In this episode:

    • Why factories need complete drawings—not 80% complete
    • The exponential cost of late changes in modular
    • Why modular demands better owners who can make decisions early
    • How indecision destroys modular projects

    Built Different is brought to you by Spring Street Management Group.

    Mehr anzeigen Weniger anzeigen
    3 Min.
Noch keine Rezensionen vorhanden